Pwd Dsr 2017-18 Maharashtra New! Direct
The is a critical regulatory document used to standardise construction costs for government projects across the state. Effective from September 22, 2017 , it provides the foundational rates for material, labour, and machinery used in public infrastructure. Key Highlights of DSR 2017-18
: Standard rates are subject to percentage increases for specific working conditions: Corporation & Municipal Areas : 5% increase. pwd dsr 2017-18 maharashtra
The is far more than an old rate list. It is a financial time capsule that governs pending contracts, arbitration cases, and escalation claims across the state. While it should never be used for fresh estimates without modification, its role in maintaining baseline fairness for legacy projects is irreplaceable. The is a critical regulatory document used to
| S.No. | Item Description | Unit | Rate (₹) | |-------|----------------|------|-----------| | 1 | Excavation in ordinary soil (up to 1.5m depth) | cum | 185 | | 2 | Filling with available earth (including watering & ramming) | cum | 120 | | 3 | Brick masonry with common burnt clay bricks (CM 1:6) | cum | 4,850 | | 4 | RCC M20 grade (excluding reinforcement) | cum | 5,200 | | 5 | Reinforcement steel (Fe500, including cutting & bending) | kg | 55 | | 6 | 12mm thick cement plaster (CM 1:6) | sqm | 145 | | 7 | 20mm thick grit plaster (CM 1:4) | sqm | 215 | | 8 | Primer coat on road surface | sqm | 18 | | 9 | Bituminous concrete (BC) (40mm thick) | sqm | 425 | | 10 | 100mm dia PVC pipe laying (including trenching) | m | 285 | The is far more than an old rate list
For contractors still working on PWD projects awarded in 2017 or 2018, keeping a verified copy of this DSR is not optional—it is essential. For government engineers, understanding its structure helps defend audit queries and resolve disputes efficiently.
⚠️ Be careful with third-party websites – rates are often scanned copies from original PWD books; verify authenticity.